Hangzhou color powder coating Equipment Co., Ltd
|
Place of Origin: | Zhejiang, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
door spraying assembly line / Wood Door Painting Line
Security door Spray Coating Line ,Spraying Assembly Line 1 - 6m/min
Security door spraying line professional design
Custom processing:
1, name of the workpiece :standard door, workpiece material: steel workpiece weight ≤ 50 kg / pc
2, maximum workpiece combination of a single piece: L1200 x D300 x H2200 (mm);
3, the annual output: 100000 Tang standard security doors
4, hanging chain with the QXT-250 splice chain, single point lifting 50kg, frequency control;
5, spraying equipment Powder room 4 sets; painting room sets
6, heat source: coal,also you can choose electric ,gas ,oil according to your request
The main technical parameters
Spray drying tunnel: L35m × W2.69m × H3.49m
Combination of paint transfer drying tunnel: L35m × W4.04m × H3.49m
Chassis height of 2.5 meters
spray booth specifications L7.2 × W1.5 × H3.6 (m)
The paint specifications L8.5 x W4.4 x H3.6 (m) four
The spraying range workpiece outer surface
Conveyor chain : QXT-250.
Single point of loading capacity ≤ 50 kg
The chain spray 250 meters;Transportation methods hanging conveyor
Transmission overhead conveyors
Motor power 3.0 kW single-drive /3set
Curing temperature and time of 180 - 220 ° C for about 20 minutes
Heating source coal
The issue of the calorific value curing drying tunnel 60 million kcal.
Equipment design, installation strictly abide by relevant state fire safety, health and environmental standards
According to the specific requirements of customers, customers to meet anticipated production production to ensure product quality
Selection of materials, parts and electrical components, reliable quality, selection of domestic and foreign famous brand products, key materials, spare parts and electrical components to ensure the stability of the device performance and reliable
Be considering the existing conditions of the customer plant design, take full advantage of customers' existing venues
The use of coal-fired heating, can minimize the cost of production
Take full account of the chain between the equipment system design, customer product process and logistics and coordination equipment system resistance to take protective measures
Effectively improve the working environment for the operator offers spacious, bright room for maneuver